Default Field Mappings for PPM and QC 10.00
The following sections describe the default field mappings that are available for integration with Quality Center defects and requirements.
Default Field Mappings for Quality Center 10.00 Defects
The table below describes the default defect mappings that can be modified for the integration between the Defects Module in Quality Center and the ALM - Defect Template with Quality Center Integration request type in PPM. The Override column indicates which field is dominant by default—PPM (if set to PPM), Quality Center (if set to QC), or neither (if set to BIDIRECTIONAL). For more information, see Creating the Mapping Between PPM and QC Fields.
Quality Center Field Name, |
PPM Field Name, |
Override |
---|---|---|
Reproducible |
Reproducible |
QC |
Project |
Application |
QC |
Actual Fix Time |
Actual Fix Time (days) |
QC |
Closed in Version |
Closed in Version |
QC |
Severity |
Severity |
BIDIRECTIONAL |
Closing Date |
Closed on |
QC |
Detected in Version |
Detected in Version |
BIDIRECTIONAL |
Planned Closing Version |
Planned Closing Version |
BIDIRECTIONAL |
Estimated Fix Time |
Estimated Fix Time (days) |
BIDIRECTIONAL |
Comments |
Developer Comments |
PPM |
Detected on Date |
Created On |
PPM |
Priority |
Priority |
BIDIRECTIONAL |
Description |
Detailed Description |
BIDIRECTIONAL |
Detected By |
Detected in Quality Center by |
QC |
Status b, c |
Request Status b |
PPM b |
Quality Center Defect Status c |
QC c |
|
Summary |
Summary |
BIDIRECTIONAL |
a. The listed PPM database IDs are the same as in the PPM Workbench. The exact database IDs are displayed by the integration tool. b. When the Request Status field is updated in PPM, the new status is sent to Quality Center. If the new status matches one of the defect status in Quality Center, the Status field in Quality Center is updated; if not, the update is ignored by Quality Center. c. When the status of a defect is updated in Quality Center, the associated Quality Center Defect Status field in PPM is updated accordingly if the value sent by Quality Center is a valid workflow step transition in PPM. |
Default Field Mappings for Quality Center 10.00 Requirements
The table below describes the default requirement mappings that can be modified for the integration between the Requirements Module in Quality Center and the ALM - Request for Change (RFC) request type or the ALM - Release Management request type in PPM. The Override column indicates which field is dominant by default—PPM (if set to PPM), Quality Center (if set to QC), or neither (if set to BIDIRECTIONAL). For more information, see step 8.
Quality Center Field Name, |
PPM Field Name, |
Override |
---|---|---|
Priority |
RFC Priority |
PPM |
Author b |
Created By |
PPM |
ITG Request Status c, d |
RFC Status c |
PPM c |
Quality Center Status d |
QC d |
|
Name |
RFC Summary |
PPM |
ITG Request Description |
RFC Description |
PPM |
Assigned To |
Quality Center Assigned To User |
PPM |
a. The listed PPM database IDs are the same as in the PPM Workbench. The exact database IDs are displayed by the integration tool. b. The Author field in Quality Center displays the name of the user who created the request in PPM. Quality Center can accept any name, but PPM cannot. If you configure this field to be bidirectionally updateable and a user selects a user name in Quality Center that does not exist in PPM, the operation will fail. User name lists must therefore be synchronized. c. When the RFC Status field is updated in PPM, the new status is sent to Quality Center. If the new status matches one of the requirement statuses in Quality Center, the ITG Request Status field in Quality Center is updated; if not, the update is ignored by Quality Center. d. When the status of a requirement is updated in Quality Center, the associated Quality Center Status field in PPM is updated accordingly if the value sent by Quality Center is a valid workflow step transition in PPM. e. The Quality Center fields with the database ID of RQ_USER_XX are user fields that are added to Quality Center when using the integration tool to enable a project. The value of XX is determined when the user field is added to Quality Center. |